Customer installation

Hub and two Power Boxes during commissioning

A stack of two Power Boxes with the Smart Solar Hub on top, photographed while the installer connects the panel cables.

Sample for design review: this content will be checked by the client before the site goes live. ●

Hub and two Power Boxes during commissioning

The photograph was taken at a customer site during commissioning. The stack stands on the floor; the panel cables arrive from above and plug into the Hub with MC4 connectors. The multimeter in the picture is used to check string voltage and polarity before the connectors are closed.

What the installer checks

  • String voltage within the input range on the datasheet.
  • Polarity of every MC4 pair before it is plugged in.
  • Battery displays show the same state of charge before the units are connected in parallel.
  • 10 cm of free air around the stack once the packaging is removed.

Location and customer details are withheld until the customer has agreed to publication. ●

Hub and two Power Boxes during commissioning (2)

Products used

More projects

Planning something similar?

Send us the setting and the consumption; we propose a configuration.

Fields marked * are required.

One working day reply. Your details are used for this quote only. How we handle your data: Privacy